Cedar Ridge Apartments Ph. II
PRJ-2026-0141 · Multi-family ·
multifamily · Sacramento Metro
4820 Cedar Ridge Pkwy, Sacramento, CA
Status
- Stage
- Out for Bid
- Days in stage
- 29
- Confidence
- high
- Temperature
- hot
- Expected start
- 2 Nov 2026
- Expected end
- 28 Feb 2027
- Start window
- 2 Nov 2026 – 2 Nov 2026
- Whisper→bid
- 42d
- Forecast
- $412,000
Parties
- GC
- Halvorsen Construction
- Framers
-
Ironwood Framing — RosevilleVasquez Framing
Roles are held per project, not as a column on the party — the same firm can be a GC on one building and a framer on another.
Plan versions
- A 10% plans 82,000 sq ft received 28 Jun · Bid set — layout only
- B 40% plans 84,500 sq ft +2,500 received 11 Aug · Wing added on the north elevation
Bid cycles
| Round | Reason | Plans | Opened | Days open | Invited |
|---|---|---|---|---|---|
| #1 | Initial bid | rev A (10%) | 2 Jul – 8 Aug | 37 | 0 of 0 quoted |
| #2 ← carried from #1 | Plan revision | rev B (40%) | 14 Aug | 29 (open) | 1 of 2 quoted |
Invitations
- #2 Vasquez Framing Quoted received 14 Aug, 14-day window
- #2 Ironwood Framing — Roseville Invited received 15 Aug, 13-day window · No response yet
Scope
| Category | Tier | Quantity | Intent | Note |
|---|---|---|---|---|
| Roof truss | Engineered to order | 262,000 Board foot | quoting | |
| Floor truss | Engineered to order | 78,000 Board foot | quoting | |
| Wall panel | Engineered to order | — | by others | Framer panelizing on site |
| Hardware | Catalog | 1 Each | quoting | Hanger package |
3 of 4 lines are being quoted. Completeness against these lines warns rather than blocks (TKO-15) — a gap is a prompt, not a gate.